Salvage VIN History← Search another vehicle
Vehicle Auction History

2026 BMW M5

Browse more BMW auction records
TOURING
VINWBS83GV07TCW00246
Archive Snapshot
1Auction Record
8Archived Photos
IAAIAuction Source
June 15, 2026Latest Appearance
Latest Auction Record
IAAILot #45200969
Final Bid
$51,000
Auction Date
June 15, 2026
Mileage
3,648 miles
Primary Damage
REAR
Location
Baltimore, MD
Want this auction record removed?
Request removal of this listing and its archived photos.
View full auction record →
Vehicle Overview

About This BMW

2026 BMW M5 Touring is archived under VIN WBS83GV07TCW00246. Reported specifications include 4.4L V-8 DI, DOHC, VVT, TURBO, 577HP engine, Automatic transmission, All Wheel Drive, Hybrid fuel. The most recent archived auction appearance was recorded through IAAI on June 15, 2026 in Baltimore, MD with 3,648 miles. The auction record reported primary damage listed as Rear, secondary damage listed as Front End. The archived final bid was $51,000.

Vehicle & Auction Details

Details reported for the most recent archived auction record.

Vehicle

Color
GREY
Engine
4.4L V-8 DI, DOHC, VVT, TURBO, 577HP
Transmission
AUTOMATIC
Drivetrain
ALL WHEEL DRIVE
Fuel
HYBRID

Auction & Condition

Primary Damage
REAR
Secondary Damage
FRONT END
About this auction history

Archived auction records reflect information associated with the vehicle at the time of each auction listing. A vehicle's condition, mileage, ownership or other details may have changed since the recorded auction date.

Similar BMW M5 Auction Sales

Compare recent archived auction results for similar vehicles.

View all BMW M5 auctions →